LV substation reconstruction
wire-drawing machine, motor distribution
transformer station, cabling
wire-drawing machine, motor distribution, 22/0,4 kV transformer station extension
wire-drawing machine, motor distribution, 22/0,4 kV transformer station extension
furnace transformer connection by MV cables
transformer station, cabling, motor distribution
rolling mill - new transformer 2 MVA connection
incoming 110/22/6 kV substation, 6, 22 and 110 kV cabling transmission output of turbo generator TG 5,25 MW, repair of MV cable routes, lighting, bus bar system,
power transformer T201, delivery and assembly of electronic protection for MV power system, minihuť - complete electrical installation, voltage regulation of distribution network - adjustments in of 22 kV and 6 kV substation for telemetry, repair of TG1 and 2 - detail design, installation
reconstruction of110 kV substation - design, supply of 110 kV instruments cabling, dismantling and assembly work, control system, civil works, reconstruction of substation R14 - final design, MV and LV deliveres, control system, coating Line - electrical installation, heavy- and light-current distributions, bell annealing furnace for high temperature - electrical installation, heavy- and light-current distributions
fluidized-bed boiler K11, continuous casting, nreconstruction and updating of production technology, 6kV substations, motor distribution, MV and LV cabling, power supply of ladle furnacer, general reparation of cobe - oven battery No.2: Final design, LV electrical installation, cable troys
reconstruction of boilers K9 and K10, reconstruction of the generator TG 8 including the power output, ISSM – secondary metallurgy, cable distribution, motor installation, control system, continuous casting, 6kV and LV substations, supply cable distribution, 22kV substation renovation, arrangement rebuilding of 6 kV network